Digital LG plus Series Guia de Configuração Página 38

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 186
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 37
38
Chapter 2 Install Basic Components
Figure 26. Ribbon Path
6. Thread the ribbon around the ribbon guide and along the ribbon path.
Refer to the ribbon path diagram on the shuttle cover. Be sure to thread
the ribbon between the hammer bank cover and the ribbon mask.
CAUTION
The ribbon must not be twisted. A twisted ribbon can lower print quality,
shorten ribbon life, and cause paper jams.
55rib2a
April 27, 2001
Ribbon Guide
Hammer Bank Cover
Ribbon Mask
Front of
Printer
Platen
Paper
Ribbon
Ribbon Mask
Hammer Bank Cover
Hammer Tip
Vista de página 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 185 186

Comentários a estes Manuais

Sem comentários